Green Roofs Spain
Project in Spain with SELDX Solutions
Controlit was installed in a Green Roof project as part of the building’s Quality Control and Leak Prevention plan.
Substrate: Controlit GS Single Ply
Integrity Testing using High-Voltage Electronic Leak Detection (ELD) equipment was conducted immediately after the waterproofing installation to ensure the system's integrity before adding the green roof layers.
After the Green Roof is completed, Low-Voltage ELD can also be performed for ongoing Preventive Maintenance.